So we have just finished our bid/permit set for the project utilizing Revit Architecture and Revit MEP. While it has shown me that it has a lot of potential, it will have to be developed over more projects. This was the first project completed by this MEP/FP engineer in Revit MEP so they had to crib in a lot of typical details from AutoCAD in order to get the drawings done on time. Also, due to Revit crashes they had to finish the fire protection drawings in AutoCAD.

We plan to have a meeting in the next weeks to evaluate the process and I will share the information that we compile so that others may work more effectively. This is also very important since we received approval to proceed with two new buildings on the same site. We are going to push this project forward utilizing complete use of Revit Architecture, MEP, and Structure. Each of the consultants are on board so hopefully we can weed out some of the issues and have a very successful project.


No change in programs can ever go perfect so I will try to weed out the comments that are due to learning and those that are due to how we work together. More to come soon so check back often. I will also post the 3D renderings once they are done. The facade work as shown below includes brick, EIFS (stucco), metal panel and curtainwall system.

  © Blogger template 'Neuronic' by Ourblogtemplates.com 2008

Back to TOP